Underground station · Madrid · 2003
Granite platforms, from building site to opening day
Four moments in the same station: two months before work began, cleaning the platforms with Static-98-RD, treating the Azul Arán granite with HIGALTOR-M1, and the platforms in service. The Santiago granite platform was treated with HIGALTOR-PSG.
Two months before treatment began
Cleaning the platforms with Static-98-RD
Treating the Azul Arán granite with HIGALTOR-M1
The platforms in service, two months after completion
Railway depot · Madrid
A depot hall, step by step
The same floor photographed at three points: dirty, cleaned but not yet treated, and during the application of D-340. It is the clearest example of what each stage contributes, because cleaning and treatment can be seen separately.
Before cleaning
Cleaned and not yet treated
Applying D-340
Underground station · Leganés (Madrid) · April 2003
Terastone platform and concourse
HIGALTOR-PM-4-K stain-resistant, anti-slip and polishing protector on Terastone flooring, on both platform and concourse. Other stations on the same line, with the same flooring, were treated with HIGALTOR-F-20.
Platform treated with HIGALTOR-PM-4-K
Concourse treated with HIGALTOR-PM-4-K
Concourse cleaned and treated with D-340
Transport interchange · Móstoles (Madrid) · April 2003
Bush-hammered terrazzo concourse
Cleaning with Static-98/R and D-316, then a water- and oil-repellent treatment with D-340. Three states of the same floor coexisted in the concourse — treated, cleaned but untreated, and uncleaned — allowing the result to be compared on the spot.
Shopping centre · Seville
Terastone in a constant-traffic area
Stain-resistant and anti-slip treatment on Terastone with HIGALTOR FLK 33, in aisles and the sales floor. These surfaces are walked on all day long, where stain resistance shows straight away.
Aisle treated with HIGALTOR FLK 33
Sales floor, with the product applied
One treated area and one untreated area
Shopping centre · Málaga
Outdoor tecnopavimento, half and half
Treatment with D-340 on an outdoor tecnopavimento floor. The photograph was deliberately taken with the job half done: the treated part and the untreated part appear in the same image.
Synthetic flooring
A trencadís mosaic
Treatment with the two-component HIGALTOR-PM-1 on synthetic trencadís flooring. A decorative floor, with colour and relief, protected without dulling either of them.
Mosaic treated with two-component HIGALTOR-PM-1
Other project references
Companies, contractors and public bodies on whose projects our treatments have been applied.
- ACCIONA
- AENA
- Altos de Almenara (Sotogrande)
- CaixaForum Barcelona
- Centro Médico Teknon
- Corsán-Corviam
- Dragados-ACS
- FCC
- Fòrum 2004
- Geocisa
- Gerencia Provincial de Urbanismo de Córdoba
- Gobierno de Gibraltar
- Hipercor Los Arcos (Sevilla)
- Infoglobal
- Metro de Madrid
- MetroSur
- Metro de Bilbao
- Ministerio de Fomento — Secretaría de Marina Mercante
- Mintra (Comunidad de Madrid)
- Nexo
- Norman Foster
- OHL
- Parques de Valgrande (Sotogrande)
- Plaza Mayor de Valladolid
- Puerta de Córdoba (Carmona)
- RENFE Cercanías
- RTVA Canal Sur
- Sacyr
- Vías
The photographs were taken during the work itself. They are not studio shots: they are the ones the team took on site.